Sign In | Join Free | My chinaqualitycrafts.com
chinaqualitycrafts.com
Products
Search by Category
Home > Formwork >

Steady , synchronous Pier formwork , Shoring Tower Climbing Formwork hydraulic system

Categories Bridge Formwork
Brand Name: ZULIN
Model Number: Auto-climbing Formwork; Ring-lock Shoring; Box Girder Formwork
Certification: ISO9001-2008
Place of Origin: Beijing, China (Mainland)
MOQ: One 20ft container
Price: negotiate
Payment Terms: T/T L/C (bank transfer)
Supply Ability: 100sets/day
Delivery Time: after deposit 15-20 days
Packaging Details: in bulk ,pallet ,bundle or according the customer demand
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
  • Submit Buying Request
    • Product Details
    • Company Profile

    Steady , synchronous Pier formwork , Shoring Tower Climbing Formwork hydraulic system

    Steady , synchronous and safe Auto Self Climbing Formwork QPMX-50


    Descrition:

    The lifting power of the Formwork QPMX-50 comes from its hydraulic system, which includes the oil cylinder

    and commutator. Through functioning of hydraulic system, the steel rail and bracket can climb up alternately,

    so the whole formwork system climbs steadily, independent of a crane. It' s easy to operate, and climbing is fast and safe.


    Structure



    The Characteristics


    1. One oil cylinder unit can lift 50KN.
    2. The QPMX-50 system can climb not only vertically but also slantwise, and the forward or backward inclination

    can be up to 18 degrees.
    3. The system can climb up wholly or separately. The climbing process is steady, synchronous and safe.
    4 .The bracket does not come back to the ground until construction work is finished, and spacing for work is

    reduced while the bumping damage is almost completely prevented, especially for the plywood.
    5.The error of structure construction is tiny and easy to correct.
    6.The formwork can climb up by itself and cleaning work can be done in situ. The number of crane lifts are

    greatly reduced.


    Standard Climbing Process


    1. Set up the formwork by wall-through tie-rods and pull-push props, embed anchors and do the first concrete

    pouring.
    2. Remove the formwork after the first pouring and fix anchor shoes on the finished wall, lift the brackets and

    formwork

    to the right position, match the formwork and do the second pouring.
    3. Lift formwork and brackets to the higher floor; fix climbing rail and hydraulic system.
    4. Match the formwork to the right position and do the third pouring.
    5. Strip the formwork and fix anchor shoes on the finished wall, then let the climbing rails climb.
    6. Brackets climb up to the right position, then install suspended platform.
    7. Match the formwork, do the concrete pouring, and proceed into the standard climbing stage.


    Project:

    Suramadu Bridge(Indonesia)

    Client:

    China Road & Bridge Corporation

    Date:

    09/2006

    Formwork Type:

    Hydraulic Automatic Climbing Formwork

    Comments of client:

    We choose Zulin, because he offer us excellent design plan and satisfy us from each aspect. We like Zulin, because his design is not only safe but also high efficiency.


    Buy Steady , synchronous Pier formwork , Shoring Tower Climbing Formwork hydraulic system at wholesale prices
    Send your message to this supplier
     
    From:
    To: Beijing Zulin Formwork & Scaffolding Co., Ltd.(1)
    Subject:
    Message:
    Characters Remaining: (0/3000)
     
    Inquiry Cart 0