Sign In | Join Free | My chinaqualitycrafts.com |
|
Categories | Conductor Stringing Tools |
---|---|
Brand Name: | Lingkai |
Model Number: | SFS |
Certification: | ISO |
Place of Origin: | Ningbo |
MOQ: | 1 set |
Price: | get the latest |
Payment Terms: | T/T, L/C, Western Union |
Supply Ability: | 2000 sets/month |
Delivery Time: | 3-5 working days |
Packaging Details: | wooden case packing |
Name: | Overhead Lines Bicycles |
Rated load: | Max. 1.5 KN |
Conductor: | Single, 2, 3, 4, 6 |
Type: | Bicycle or Air Cart |
Diameter of Conductor: | Max. 160 mm |
Packing: | plywood case |
Company Info. |
Ningbo Lingkai Electric Power Equipment Co., Ltd. |
Verified Supplier |
View Contact Details |
Product List |
Prodcut Introductions
Spacer Trolleys and Overhead Lines Bicycles are special tools widely used in transmission line maintenance and accessory installation operation. We have designed and produced series of Spacer Trolleys and Bicycles for working on single, two bundled, three bundled, four bundled, six bundled conductors
This Four Bundle Conductors Line Cart is commonly used to install the conductor attachments, and overhaul the lines on the four bundle conductor, among others. The distance between the conductors should be clearly explained while an order is placed.
Technical Parameters
Item Number | Model | Rated Load (kN) | Maximum Through Diameter (mm) | Distance between Conductors (mm) | Weight (kg) |
17271 | SFS1 | 1.5 | Φ70 | 450 | 40 |
500 | |||||
17272 | SFS3 | 1 | Φ40 | 400 450 500 | 36 |
450 | 38 | ||||
500 | 40 | ||||
17273 | FCS400/450 | 1 | Φ60 | 400~450 | 43.5 |
2 Bundled Conductors Spacer Trolleys and Bicycles
Item No. | Model | Rated Load (KN) | Distance BT. conductors | Weight (kg) | Style |
17251 | SFS2 | 1 | 400, 450, 500 | 34, 36 | Horizontal bicycle |
17253 | SFS400 | 1 | 400 | 40 | Vertical bicycle |
17255 | FC400/450S | 1 | 400~450 | 34 | Horizontal bicycle |
17256 | SFS1-400 | 1.5 | 400 | 38 | Horizontal cart |
17257 | SFS1-450 | 1.5 | 450 | 40 | Horizontal cart |
Application: It is used to install conductor spacers or other attachments and inspect lines on 2 bundled conductors.
Note: Arrangement (horizontal or vertical) and distance between sub conductors of the bundle should be specified in the order.
![]() |