Sign In | Join Free | My chinaqualitycrafts.com
chinaqualitycrafts.com
Products
Search by Category
Home > Metal Building Materials >

Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging

Categories UV Cured CIPP
Brand Name: DAO
Place of Origin: Jiangsu, China
MOQ: 50m
Price: Variable
Payment Terms: T/T
Supply Ability: 300 km per year
Delivery Time: 15 working days
Packaging Details: Customized as required
Liner: Wet
Diameter: DN850
Thickness: 9mm
Length: 70m
Weight: Variable
Life: 50 years
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging

Wet liner for CIPP UV renovation of underground pipes by no digging method


Pull the lamp rope with the reserved rope

The reserved rope and the pull light rope shall be connected with a dead buckle to ensure that they will not fall off accidentally, and the nodes shall be wrapped with adhesive tape. Especially for the rope end of the lamp rope, it is easy to cause the inner membrane to scratch during the dragging process.

In the process of pulling the lamp rope down into the material with the reserved rope, it must be operated when the material is inflated. Otherwise, it is easy to cause inner membrane damage.


Lower lamp

Under the light of the link is the most cause intimal damage. Be careful. Before lowering the lamp, check the lamp wheel, lamp body, and connecting wire for burrs and resin. If any, clean it and treat the wheel smoothly. If it is a headlamp wheel, it is recommended to wipe a small amount of grease to reduce the friction of the material's inner membrane when the headlamp is lifted and lowered.


During the process of lowering the lamp, it is necessary to ensure that the material bulges up and the lamp enters the material smoothly without obstacles. If it cannot enter smoothly, it is necessary to find out the reasons for the obstacles. It is not allowed to drag or kick. Most of the inner membrane damage occurs at this time. The lamp shall be pulled into the material as far as possible, and sufficient length shall be reserved for the binding head for easy operation to avoid hindering the lifting of the headlamp.


MaterialWet liner
Technology appliedTT
LengthAny length is possible

Buy Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging at wholesale prices
Send your message to this supplier
 
*From:
*To: Daoyunai Energy Saving Technology Limited
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0